Anchor Darling 800-lb. Split-Wedge Gate
½" through 2" Valves with Handwheels
FCD ADENIM0002-00
Installation
Operation
Maintenance
INSTRUCTION MANUAL
Experience In Motion
Vue de la page 0
1 2 3 4 5 6 ... 19 20

Résumé du contenu

Page 1 - INSTRUCTION MANUAL

Anchor Darling 800-lb. Split-Wedge Gate½" through 2" Valves with Handwheels FCD ADENIM0002-00InstallationOperationMaintenanceINSTRUCTION MA

Page 2 - Table of Contents

109.0 MAINTENANCE INSTRUCTIONS (Continued) 9.1.2 Assembly Assembly of the valves is simply the reverse of disassembly. Prior to reassembly, note

Page 3 - Revision Sheet

119.0 MAINTENANCE INSTRUCTIONS (Continued) 9.1.2 Assembly (Continued) (g) Note that it is not necessary to torque the gland retainer (131).

Page 4 - 3.0 OPERATING CONDITIONS

129.0 MAINTENANCE INSTRUCTIONS (Continued) 9.2 Replacement of Packing (Reference Figure 1) If the valve is in service, backseat it. If the valve

Page 5 - 4.0 TEST CONDITIONS

139.0 MAINTENANCE INSTRUCTIONS (Continued) 9.3 Lapping Procedure After the valve has been disassembled, a visual inspection of the seating surfa

Page 6

1410.0 STORAGE REQUIREMENTS The valves have been shipped in the closed position. Upon receipt of the valves at their destination, the crates should

Page 7 - AND PROCEDURES

15SECTION 11.0BOLTING TORQUE VALUESRefer to the applicable Customer-Certified Assembly Drawing(s) (Section 13.0) for any specific torque requirement

Page 8 - 9.0 MAINTENANCE INSTRUCTIONS

1611.0 BOLTING TORQUE VALUES At intervals of not more than six months, check the tightness of all bolting. The recommended torque values for all bo

Page 9

17SECTION 12.0REFERENCE DRAWINGS800-lb. Split-Wedge Gate Valves FCD ADENIM0002-00

Page 10

18SECTION 13.0CUSTOMER-CERTIFIED ASSEMBLY DRAWING(S)800-lb. Split-Wedge Gate Valves FCD ADENIM0002-00

Page 11

19Figure 1800-lb. Split-Wedge Gate Valves FCD ADENIM0002-00

Page 12

1.0 Physical Description and Operation of Equipment 2.0 Design Conditions 3.0 Operating Conditions 4.0 Test Conditions 5.0 Operating Precautions

Page 13

flowserve.comUnited StatesFlowserve CorporationFlow Control Division1900 S. Saunders StreetRaleigh, NC 27603 Phone: (919) 832-0525Fax: (919) 831-336

Page 14 - 10.0 STORAGE REQUIREMENTS

800-lb. Split-Wedge Gate Valves FCD ADENIM0002-00Revision Sheet3Revision Date Changes Description- 10/17/2003 Original Issue

Page 15 - (Section 13.0)

41.0 PHYSICAL DESCRIPTION AND OPERATION OF EQUIPMENT 1.1 Split-Wedge Gate Valves The Flowserve Corporation split-wedge gate valve design is comp

Page 16 - 11.0 BOLTING TORQUE VALUES

54.0 TEST CONDITIONS 4.1 Each valve covered by this manual has received the following hydrostatic tests. 4.1.1 A shell hydrostatic test at 1.5

Page 17 - REFERENCE DRAWINGS

66.0 INSTALLATION INSTRUCTIONS 6.1 Lifting and Handling Requirements and Limitations 6.1.1 Good judgment should be exercised in selecting a lif

Page 18 - SECTION 13.0

77.0 MAINTENANCE REQUIREMENTS 7.1 Preventive Maintenance 7.1.1 Check all nuts and bolts periodically to ensure tightness and to forestall possibl

Page 19 - Figure 1

89.0 MAINTENANCE INSTRUCTIONS 9.1 The following instructions cover the disassembly and reassembly of a split-wedge gate valve. Typical valve

Page 20

9.0 MAINTENANCE INSTRUCTIONS (Continued) 9.1.1 Disassembly (Continued) (h) Loosen the gland retainer setscrews (220) until they do not make con