GESTRA Steam Systems
SRL 63-a
Installation Instructions 818588-00
Logic Unit SRL 63-a
Vue de la page 0
1 2 3 4 5 6 ... 17 18

Résumé du contenu

Page 1 - SRL 63-a

GESTRA Steam SystemsSRL 63-aInstallation Instructions 818588-00Logic Unit SRL 63-a

Page 2 - Contents

10Electrical ConnectionConnecting the terminal stripsConnect the terminal strips as shown in the wiring diagram.The measuring pot is provided with thr

Page 3

11Electrical Connection – continued –Wiring diagram of logic unit for monitoring SRL 63-aX11234567891011121314151617181920X3123456712345678910D1D2E1E2

Page 4 - Important Notes

12Basic SettingFactory settingLogic unit SRL 63-a The logic unit for monitoring is delivered with the following factory settings: Interval time: 24 h

Page 5 - Explanatory Notes

13Start-up, Operation, Alarms and Testing – continued –SRL 63-a – continued –OperationInterval time is running. No pilot lamp is alight. Trouble-free

Page 6

14Start-up, Operation, Alarms and Testing – continued –SRL 63-a – continued –The terminal strips of the logic unit SRL 63-a are electrically live duri

Page 7 - Technical Data

15TroubleshootingFault findingAppendixDecommissioningAfter de-energizing the logic unit, undo all the electrical connections and pull the cables out o

Page 8 - Technical Data – continued –

16Appendix – continued –TÜV approval

Page 9 - Remaining:

17Appendix – continued –TÜV approval - continued -

Page 10 - Electrical Connection

818588-00/306agt ©2006 GESTRA AG Bremen Printed in Germanywww.gestra.deGESTRA AGPostfach 10 54 60, D-28054 Bremen Münchener Str. 77, D-28215 Bremen T

Page 11 - – continued –

2ContentsPageImportant NotesUsage for the intended purpose...

Page 12 - Restarting the interval time

3ContentsPageAppendixDecommissioning ...

Page 13 - Operation

4Important NotesUsage for the intended purposeThe logic unit SRL 63-a may be used in steam boiler plants only in conjunction with external low-level a

Page 14

5Explanatory NotesScope of supplySRL 63-a1 Logic unit for monitoring, in a field case for wall mounting1 Installation manualDescriptionFor the install

Page 15 - Appendix

6Explanatory Notes – continued –Function – continued –The logic unit monitors the following times: Interval time: This is the time interval at which,

Page 16 - Appendix – continued –

7Technical DataSRL 63-aInputs 5 volt-free contacts from the limit switches of the valves1 volt-free contact from a second SRL which may be mounted at

Page 17

8Technical Data – continued –Name plate / markingDimensionsÜberwachungs-logikIP 65 50 / 60 Hz230 V BetriebsanleitungbeachtenSee inst

Page 18 - GESTRA AG

9InstallationInstalling the logic unit SRL 63-aThe case of the logic unit is intended for wall mounting; it should be installed near the external meas