Flowserve PMV P4 Manuel d'utilisateur Page 16

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 42
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 15
16
WARNING! Units installed in hazardous
areas must have proper approvals.
The I/P unit is mounted directly on top of
the positioner unit.
No external air supply is needed since the I/
P unit is supplied with air from the positio-
ner unit.
Port I on the positioner unit will be plugged
when the I/P unit and the appropriate gauge
block gasket installed.The I/P unit accepts a
4-20 mA input signal.
11. I/P Unit (P5/EP5)
1
2
The I/P unit is equipped with a built in 30
micron filter (Fig 4).
Caution: Do not operate the unit without fil-
ter and filterplug installed.
Ensure that wiring between I/P and termin-
als are properly seated in rubber clamp.
Do not unscrew filterplug when the positio-
ner is pressurized.
Span and Zero for the I/P converter is factory
set and can not be adjusted
Fig 3
Vue de la page 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 41 42

Commentaires sur ces manuels

Pas de commentaire