Installation InstructionsCBR SeriesSingle Inside Bellows SealExperience In Motion
21 Equipment Check1.1 Follow plant safety regulations prior to equipment disassembly: • lock out motor and valves.
31.7 Check gland pilot and bolt holes to ensure they are adaptable to the equipment and are the same as shown on the assembly drawing.1.8 Handle all
4Determining the Correct Installed Operating Length Dimension Figure 3Inch Units(Metric Units)R(I1) 18
52.2 Scribe mark B, Figure 1, at the seal setting point shown on the assembly drawing included with the seal. (This is the seal setting dimension as
62.12 Position the gland to the face of the seal housing. Be sure the gland pilot is properly engaged. Tighten the gland stud nuts evenly, cross s
75 RepairThis product is a precision sealing device. The design and dimension tolerances are critical to seal performance. Only parts supplied by Flo
flowserve.comTO REORDER REFER TOB/M #F.O.To nd your local Flowserve representativeand nd out more about Flowserve Corporation, visit www.owserve.co
Commentaires sur ces manuels