Installation InstructionsCPM Seal SupportReservoir AssemblyFlow Solutions Division
IntroductionThis manual covers the installation and operation of the CPM SealSupport Reservoir for dual non-pressurized (API Plan 52/ANSI Plan7352) an
visual water flow indicator. However, when using API Plan 53/ANSI Plan7353 the product must be able to accommodate a small amount ofcontamination from
Buffer/Barrier Fluid SelectionThe CPM Seal Support Reservoir is designed for use with water barrieronly in conjunction with a water header system.For
5Installation1. The reservoir is mounted vertical not more than 3 feet (.9 m) fromthe seal gland to the vertical centerline of the reservoir. The bott
68. It is highly recommended that the reservoir be flushed with cleanfluid prior to equipment start up to remove any foreign matter fromthe system.Cau
Start-Up1. API Plan 52/ANSI Plan 7352 - open valve to the vent or processrecovery system slowly.2. API Plan 53/ ANSI 7353 - slowly open valve between
FIS168ORG 01/04 USAFlowserve Corporation Flow Solutions DivisionPrinted in U.S.A.www.flowserve.comTO REORDER REFER TOB/M #F.O.All Flowserve Corporatio