Flowserve NRG 16-19 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Matériel Flowserve NRG 16-19. Flowserve NRG 16-19 User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
1
NRG 16-19
NRG 16-27
NRG 16-28
VKE 16-1
VKE 26
Installation Instructions 818725-01
Measuring electrode NRG 16-19
Measuring electrode NRG 16-27
Measuring electrode NRG 16-28
Test set VKE 16-1
Test set VKE 26
GESTRA Steam Systems
GESTRA
Vue de la page 0
1 2 3 4 5 6 ... 19 20

Résumé du contenu

Page 1 - VKE 16-1

1NRG 16-19NRG 16-27NRG 16-28VKE 16-1VKE 26Installation Instructions 818725-01Measuring electrode NRG 16-19Measuring electrode NRG 16-27Measuring elect

Page 2 - Contents

10Technical Data – continued –Dimensions of test chamber VKE 16Fig. 5LHorizontal installationb∅ iH2H1∅ D∅ g∅ kA(left) rightSDimensionsDesignsFlange

Page 3 - Contents – continued –

11Technical Data – continued –Dimensions of test chamber VKE 26Fig. 6483/8" toDIN ISO 228-1751070435635 mmSpace required for servicing313/8"

Page 4 - Important Notes

12Attentionn The seating surfaces of the steam trap or the test chamber must be accurately machined.n Do not insulate the electrode thread with hem

Page 5 - Explanatory Notes

13Installation – continued –Examples of installation NRG 16-19, NRG 16-27, NRG 16-28Fig. 8VKE 26 with NRG 16-19Test station NRA 1-3AlarmAlarmAlarmEle

Page 6 - Technical Data

14Connect the cables to the terminal strips of the test station according to the wiring diagram.WiringConnecting cables for measuring electrodesNRG 16

Page 7

15Wiring – continued –Measuring electrodes NRG 16-27, NRG 16-28 pin assignmentFig. 10Test station NRA 1-3Level switch NRS 1-23 2 1 541 Measuring elec

Page 8

16Apply mains voltage to the test station.CommissioningBefore commissioning please check: Are the measuring electrodes /temperature sensors wired in a

Page 9

17DecommissioningRemove the measuring electrode NRG 16-19, NRG 16-27, NRG 16-28 and separate the waste materials, using the material specification as

Page 11

19For your notes:

Page 12 - Installation

2ContentsUsage for the intended purpose ...

Page 13 - Installation – continued –

20818725-01/907cm · 2006 GESTRA AG · Bremen · Printed in GermanyAgencies all over the world:www.gestra.deGESTRA AGP. O. Box 10 54 60, D-28054 Bremen

Page 14

3Contents – continued –PageWiringConnecting cables for measuring electrodes ...

Page 15 - Wiring – continued –

4Important NotesDangerWhen loosening the measuring electrode steam or hot water might escape. This presents the danger of severe scalding. It is there

Page 16 - Commissioning

5Explanatory Notes Scope of supplyNRG 16-19 1 Measuring electrode NRG 16-19 1 Joint ring D 17 x 21 to DIN 7603 (made from 1.4301), form A, bright ann

Page 17 - Decommissioning

6NRG 16-19, NRG 16-27, NRG 16-28 Service pressure PN 40, max. 32 barg at 238°CConnection NRG 16-19, NRG 16-27: screwed 3/8" to ISO 228-1 NRG 16-2

Page 18 - For your notes:

7Technical Data – continued –Test chamber VKE 16DesignsElectrode connection in flow direction to the left or to the right. Please state when ordering.

Page 19

8Fig. 2 Technical Data – continued –Name plate / markingFig. 1 Equipment designation on hexagon part of electrodeEquipment designationManufacturerS

Page 20 - GESTRA AG

9Fig. 4 NRG 16-27Technical Data – continued –Dimensions of NRG 16-19, NRG 16-27, NRG 16-28Fig. 3 NRG 16-19Connector 3/8" to ISO 228-1Joint rin

Modèles reliés NRG 16-27 | NRG 16-28 | VKE 16-1 | VKE 26 |

Commentaires sur ces manuels

Pas de commentaire