Page 1 - GESTRA Steam Systems

1BA 46BA 47BAE 46BAE 47Installation Instructions 818609-00Continuous Blowdown ValveBA 46, BA 47, BAE 46, BAE 47GESTRA Steam SystemsGESTRA

Page 2 - Contents

10Technical Data – continued –Fig. 1MADE BY GESTRA AGBA 470525TMA 300°CPN 63DNMADE BY GESTRA AGBA 460525TMA 572°FB16.34 CL300DNMADE BY GESTRA AGBA

Page 3 - Contents – continued –

11DN 15-32: 126Fig. 2Technical Data – continued –Dimensions BA 46, BA 47L20180DN 15-32: 172DN 40, 50: 213DN 40, 50: 132

Page 4 - Contents – continued –

12DN 15-32: 126Fig. 3Technical Data – continued –Dimensions BAE 46, BAE 47L20100DN 15-32: 388DN 40, 50: 428DN 40, 50: 132

Page 5 - Important Notes

13Fig. 4Technical Data – continued –Capacity chart for DN 15 to 32, capacity ranges at a glanceBoiler pressure [bar]Hot water capacity [kg/h]Positi

Page 6 - Explanatory Notes

14Fig. 5Technical Data – continued –Capacity chart for DN 15 to 32, capacity range up to 310 kg/hBoiler pressure [bar]Hot water capacity [kg/h]Posi

Page 7

15Fig. 6Technical Data – continued –Capacity chart for DN 15 to 32, capacity range up to 1020 kg/hBoiler pressure [bar]Hot water capacity [kg/h]Pos

Page 8 - Technical Data

16Fig. 7Technical Data – continued –Capacity chart for DN 15 to 32, capacity range up to 2120 kg/hBoiler pressure [bar]Hot water capacity [kg/h]Pos

Page 9

17Fig. 8Technical Data – continued –Capacity chart for DN 40 and 50, capacity ranges at a glanceBoiler pressure [bar]Hot water capacity [kg/h]Posit

Page 10 - DN 25 PN 40

18Fig. 9Technical Data – continued –Capacity chart for DN 40 and 50, capacity range up to 1340 kg/hBoiler pressure [bar]Hot water capacity [kg/h]Po

Page 11 - Dimensions BA 46, BA 47

19Fig. 10Technical Data – continued –Capacity chart for DN 40 and 50, capacity range up to 4500 kg/hBoiler pressure [bar]Hot water capacity [kg/h]P

Page 12 - Dimensions BAE 46, BAE 47

2ContentsImportant NotesUsage for the intended purpose ...

Page 13 - Position of control lever

20Fig. 11Technical Data – continued –Capacity chart for DN 40 and 50, capacity range up to 6300 kg/hBoiler pressure [bar]Hot water capacity [kg/h]P

Page 14

21Fig. 12DesignBA 46, BA 47BFOLGNAKCIDEIJPQRSTUMH

Page 15

22Design – continued –BAE 46, BAE 476157Fig. 138K324Open Close

Page 16

23KeyA Stuffing box screwB Scale plateC Stuffing box glandD Disk spring (3 pieces)E Spring sleeve Packing with 4 wiper ringsG Guide sleeveH Wearing bus

Page 17

24Valve with butt-weld ends1. Ensure correct position of installation. The control lever U must be freely movable.2. Observe direction of flow. The fl

Page 18

25Installation – continued –Heat treatment of weldsAfter welding the continuous blowdown valve in place the welds might require a subsequent heat t

Page 19

26Continuous blowdown valves BAE 46, BAE 47 with actuatorApart from the positions OPEN and CLOSED you can select an OPERATING POSITION for the actuato

Page 20

27Commissioning – continued –Continuous blowdown valves BA 46, BA 47 without actuatorThe amount of boiler blowdown dictated by the operating condit

Page 21 - BA 46, BA 47

28Calculating the amount of boiler blowdownAmount of boiler water to be dischargedA = Q · S K – SA = Amount of boiler blowdown [kg/h]Q = Boi

Page 22 - BAE 46, BAE 47

29Maintenance – continued – 1. Take heed of the danger note on page 5. 2. Cut off power supply to actuator 1. 3. Undo hexagon screws 7 and remo

Page 23

3Contents – continued –WiringDanger ...

Page 24 - Installation

30n Combination spanner 7 mm A. F., DIN 3113, form Bn Combination spanner 10 mm A. F., DIN 3113, form Bn Combination spanner 13 mm A. F., DIN 3113,

Page 25 - Installation – continued –

31Maintenance – continued –Removing internalsFig. 14

Page 26 - Commissioning

32RetrofittingMounting the actuatorGESTRA continuous blowdown valves BA 46 and BA 47 can be retrofitted with a GESTRA actuator EF... (BAE 46, BAE 47).Du

Page 27 - Operation

33Spare PartsSpare parts listItemDesignationStock code Stock codeBA 46BA 47BAE 46BAE 47F NQ 5Packing/gasket kit, DN 15 to DN 32:2 packing rings 15 x 2

Page 28 - Maintenance

34DecommissioningThe equipment becomes hot during operation.This presents the risk of severe burns and scalds to the whole body.Before loosening flange

Page 29 - – continued –

35We hereby declare that the equipment BA 46, BA 47 conforms to the following European Directives:n ATEX Directive 94/9/EC of 23 March 1994 n Press

Page 30 - – continued –

36818609-00/106cm · © 2005 GESTRA AG · Bremen · Printed in GermanyGreat BritainFlowserve Flow Control (UK) Ltd.Burrel Road, Haywards HeathWest Sussex

Page 31

4Contents – continued –PageRetrofittingDanger ...

Page 32 - Retrofitting

5Important NotesUsage for the intended purposeBA 46, BA 47:Use the continuous blowdown valves BA 46, BA 47 only for discharging water from steam boile

Page 33 - Spare parts list

6Explanatory NotesScope of supplyBA 46 1 Continuous blowdown valve BA 46 1 Sample valve (not mounted)1 Gasket A17 x 23 x 1.51 Installation manualBA 47

Page 34

7System descriptionDue to the continuous evaporation process in the steam boiler the density and hence the TDS (= Total Dissolved Solids) concentratio

Page 35 - Quality Assurance Manager

8Pressure ratingsType EN ASMEBA(E) 46 PN 40 Class 150, 300BA(E) 47 PN 63 Class 400 Materials Designation EN DIN ASTM Valve body BA..., BAE...P250GH (

Page 36 - GESTRA AG

9Technical Data – continued – Overall lengths End connection [mm][inch]15½20¾251321¼401½502 Flange Class 150 L 150 150 160 180 230 230 Flange Class

Modèles reliés BA47 | BAE46 | BAE47 |

Commentaires sur ces manuels