Flowserve UBK 46 Manuel d'utilisateur Page 14

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 13
14
Attention
Only qualified welders certified e. g. according to DIN EN 287 may weld the
steam trap into pressurized lines.
Do not insulate trap.
Installation – continued –
Heat treatment of welds
A subsequent heat treatment of the welds is not required.
The flanged connections of the UBK 46 must be permanently bolted, ensuring tight shut-off. If
necessary raise or lower the condensate discharge temperature. For more information refer to section
“Adjust discharge temperature” on the following page.