Flowserve CPM Series Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Matériel Flowserve CPM Series. Flowserve CPM Series User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 12
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Installation
Instructions
Experience In Motion
CPM Series
Dual, cartridge mounted, flexible stator pusher
seal designed for general service applications
CPM PP
Vue de la page 0
1 2 3 4 5 6 ... 11 12

Résumé du contenu

Page 1 - Instructions

Installation InstructionsExperience In MotionCPM SeriesDual, cartridge mounted, flexible stator pusher seal designed for general service applicationsCP

Page 2 - 1 Equipment Check

104 Operational Recommendations4.1 Do not exceed corrosion limits. The CPM PP seal is designed to resist corrosion by most chemicals. However, do n

Page 3 - Figure 1

115 RepairThis product is a precision sealing device. The design and dimension tolerances are critical to seal performance. Only parts supplied by Flo

Page 4

TO REORDER REFER TOB/M #F.O.FIS165eng REV 01/09 Printed in USAflowserve.comTo find your local Flowserve representativeand find out more about Flowserve C

Page 5 - Connections

2DescriptionThe CPM PP seal is a cartridge mounted mechanical seal, designed for ease of installation and reliable operation. No seal setting dimensio

Page 6 - 2 CPM PP Installation

3Seal Chamber Requirements Figure 11.5 Check equipment dimensions to ensure that they are within the

Page 7 - Figure 5

4CPM PP Dimensional Data (inches) for standard bore seal chambers Figure 2ADCG KFJ19 15 14

Page 8 - 3 Piping

1.375 2.000 2.385 2.625 4.000 2.008 2.070 2.146 2.208 3.212 0.531 1.750 2.500 2.760 3.000 5.500 2.008 2.070 2.146 2.208 3.587 0

Page 9

62 CPM PP InstallationNote: No seal setting measurements are needed to install the CPM PP seal. Instructions are for vertically split case end-sucti

Page 10

7 2.5 Position the CPM PP with the gland tight against the seal chamber face. Turn the gland so that the barrier taps are positioned so that the as

Page 11 - 5 Repair

8 Inlet Outlet Clockwise (CW) Port c Port b Counterclockwise (CCW) Port b Port c Shaft rotation from exposed end of gland

Page 12 - TO REORDER REFER TO

93.3 For dual seal un-pressurized operation, supply a clean compatible buffer uid to the inlet port at a pressure below the stufng box pressure. See

Commentaires sur ces manuels

Pas de commentaire